OEM/ODM Bags: Our 8-Step Process

Every custom order follows the same documented pipeline, so you always know which step your bags are in and what happens next.

The eight steps

Inquiry & Confirmation

Share your design, reference or idea. We confirm requirements and feasibility.

1-3 days

Quotation & Contract

Itemized quote covering materials, printing and packaging, then contract signing.

1-2 days

Sampling

Paid pre-production sample built to your spec. One revision round takes 2-3 days.

5-7 days

Material Sourcing

Fabrics, hardware and trims sourced from our network of 220+ fabric suppliers.

3-5 days

Mass Production

Production on 50+ automated lines with in-line checks at each station.

15-20 days

Quality Inspection

Stitching, zippers, load points and color checked against the approved sample.

2-3 days

Packaging

Your choice of poly bag, color box, gift box, branded mailer, hang tag or dust bag.

2-3 days

Shipping

Sea, rail or air freight; small batches ship door to door by DHL, FedEx, UPS or TNT.

by term

Sampling, straight talk

Samples are paid, take 1-10 days depending on complexity, and one revision round takes 2-3 days. A paid sample means a dedicated pattern maker builds your bag exactly to spec, and the sample you approve is the standard every production unit is inspected against.

Need it faster?

Rush production is a standing option, priced transparently.

SurchargeLead time reduction
+20%about 30% faster
+30%about 50% faster
+40%about 70% faster

Payment and logistics

Payment options

T/T, L/C, D/P & D/A, MoneyGram, credit card, PayPal, Western Union, cash and third-party platforms.

Shipping

Sea, rail and air freight. Small batches go courier door to door in 5-7 working days by DHL, FedEx, UPS or TNT; sea freight runs 40-45 days.

After delivery: 24-hour response support with replacements, credits and technical help when needed.

FAQ

How long does the whole OEM process take?

From inquiry to shipment, a typical fully custom order moves through eight steps: confirmation 1-3 days, quotation 1-2, sampling 5-7, material sourcing 3-5, production 15-20, inspection 2-3 and packaging 2-3 days before shipping.

Are samples free?

Samples are paid and take 1-10 days depending on complexity. One revision round takes 2-3 days.

Can production be expedited?

Yes. A 20% surcharge cuts lead time about 30%, 30% cuts about 50%, and 40% cuts about 70%.

Which payment methods do you accept?

T/T, L/C, D/P and D/A, MoneyGram, credit card, PayPal, Western Union, cash and major third-party platforms.

Start your bag project

Send your design or reference. We reply within 24 hours.

Get a Quote